hrcak mascot   Srce   HID

Prethodno priopćenje

Finite production rate model with backlogging, service level constraint, rework, and random breakdown

Singa Wang Chiu ; Department of Business Administration, Chaoyang University of Technology, Wufong District, Taichung City 413, TAIWAN
Chen-Ju Liu ; Department of Business Administration, Chaoyang University of Technology, Wufong District, Taichung City 413, TAIWAN
Yu-Ru Chen ; Department of Industrial Engineering & Management, Chaoyang University of Technology, Taichung City 413, TAIWAN
Yuan-Shyi Peter Chiu ; Department of Industrial Engineering & Management, Chaoyang University of Technology, Taichung City 413, TAIWAN

Puni tekst: engleski, pdf (580 KB) str. 63-80 preuzimanja: 129* citiraj
APA 6th Edition
Chiu, S.W., Liu, C., Chen, Y. i Chiu, Y.P. (2017). Finite production rate model with backlogging, service level constraint, rework, and random breakdown. International Journal for Engineering Modelling, 30 (1-4), 63-80. Preuzeto s https://hrcak.srce.hr/201740
MLA 8th Edition
Chiu, Singa Wang, et al. "Finite production rate model with backlogging, service level constraint, rework, and random breakdown." International Journal for Engineering Modelling, vol. 30, br. 1-4, 2017, str. 63-80. https://hrcak.srce.hr/201740. Citirano 21.09.2021.
Chicago 17th Edition
Chiu, Singa Wang, Chen-Ju Liu, Yu-Ru Chen i Yuan-Shyi Peter Chiu. "Finite production rate model with backlogging, service level constraint, rework, and random breakdown." International Journal for Engineering Modelling 30, br. 1-4 (2017): 63-80. https://hrcak.srce.hr/201740
Harvard
Chiu, S.W., et al. (2017). 'Finite production rate model with backlogging, service level constraint, rework, and random breakdown', International Journal for Engineering Modelling, 30(1-4), str. 63-80. Preuzeto s: https://hrcak.srce.hr/201740 (Datum pristupa: 21.09.2021.)
Vancouver
Chiu SW, Liu C, Chen Y, Chiu YP. Finite production rate model with backlogging, service level constraint, rework, and random breakdown. International Journal for Engineering Modelling [Internet]. 2017 [pristupljeno 21.09.2021.];30(1-4):63-80. Dostupno na: https://hrcak.srce.hr/201740
IEEE
S.W. Chiu, C. Liu, Y. Chen i Y.P. Chiu, "Finite production rate model with backlogging, service level constraint, rework, and random breakdown", International Journal for Engineering Modelling, vol.30, br. 1-4, str. 63-80, 2017. [Online]. Dostupno na: https://hrcak.srce.hr/201740. [Citirano: 21.09.2021.]

Sažetak
In most real-life production systems, both random machine breakdown and the production of nonconforming items are inevitable, and adopting a backlogging policy with a predetermined minimum acceptable service level can sometimes be an effective strategy to help the management reduce operating cost or smoothen the production schedule. With the aim of addressing the aforementioned practical situations in production, this study explores the optimal production runtime for the finite production rate (FPR) model with allowable backlogging and service level constraint, rework of defective products, and random machine breakdown. Mathematical modelling is employed along with optimization techniques to derive the optimal production runtime that minimizes the long-run average system costs for the proposed FPR model. The joint effects of the allowable backlogging with a planned service level, rework, and random machine breakdown on optimal runtime decision have been carefully investigated through a numerical example and sensitivity analysis. As a result, important insights regarding various system parameters are revealed in order to enable the management to better understand, plan, and control such a practical production system.

Ključne riječi
production runtime; backlogging; service level constraint; breakdown; optimization; rework; mathematical modelling

Hrčak ID: 201740

URI
https://hrcak.srce.hr/201740

Posjeta: 282 *