hrcak mascot   Srce   HID

Pregledni rad

PROMJENE U PROCESU GRADNJE I ULOGE PRI PROVEDBI BIM-A NA PRIMJERU ZGRADE JAVNE NAMJENE

Ivan Janjić ; Građevinski fakultet Sveučilišta Josipa Jurja Strossmayera u Osijeku
Dina Stober   ORCID icon orcid.org/0000-0003-4312-3775 ; Građevinski fakultet Sveučilišta Josipa Jurja Strossmayera u Osijeku
Zlata Dolaček-Alduk   ORCID icon orcid.org/0000-0003-4581-6559 ; Građevinski fakultet Sveučilišta Josipa Jurja Strossmayera u Osijeku

Puni tekst: hrvatski, pdf (702 KB) str. 10-20 preuzimanja: 156* citiraj
APA 6th Edition
Janjić, I., Stober, D. i Dolaček-Alduk, Z. (2018). PROMJENE U PROCESU GRADNJE I ULOGE PRI PROVEDBI BIM-A NA PRIMJERU ZGRADE JAVNE NAMJENE. e-Zbornik, 8 (15), 10-20. Preuzeto s https://hrcak.srce.hr/203790
MLA 8th Edition
Janjić, Ivan, et al. "PROMJENE U PROCESU GRADNJE I ULOGE PRI PROVEDBI BIM-A NA PRIMJERU ZGRADE JAVNE NAMJENE." e-Zbornik, vol. 8, br. 15, 2018, str. 10-20. https://hrcak.srce.hr/203790. Citirano 27.11.2021.
Chicago 17th Edition
Janjić, Ivan, Dina Stober i Zlata Dolaček-Alduk. "PROMJENE U PROCESU GRADNJE I ULOGE PRI PROVEDBI BIM-A NA PRIMJERU ZGRADE JAVNE NAMJENE." e-Zbornik 8, br. 15 (2018): 10-20. https://hrcak.srce.hr/203790
Harvard
Janjić, I., Stober, D., i Dolaček-Alduk, Z. (2018). 'PROMJENE U PROCESU GRADNJE I ULOGE PRI PROVEDBI BIM-A NA PRIMJERU ZGRADE JAVNE NAMJENE', e-Zbornik, 8(15), str. 10-20. Preuzeto s: https://hrcak.srce.hr/203790 (Datum pristupa: 27.11.2021.)
Vancouver
Janjić I, Stober D, Dolaček-Alduk Z. PROMJENE U PROCESU GRADNJE I ULOGE PRI PROVEDBI BIM-A NA PRIMJERU ZGRADE JAVNE NAMJENE. e-Zbornik [Internet]. 2018 [pristupljeno 27.11.2021.];8(15):10-20. Dostupno na: https://hrcak.srce.hr/203790
IEEE
I. Janjić, D. Stober i Z. Dolaček-Alduk, "PROMJENE U PROCESU GRADNJE I ULOGE PRI PROVEDBI BIM-A NA PRIMJERU ZGRADE JAVNE NAMJENE", e-Zbornik, vol.8, br. 15, str. 10-20, 2018. [Online]. Dostupno na: https://hrcak.srce.hr/203790. [Citirano: 27.11.2021.]
Puni tekst: engleski, pdf (679 KB) str. 11-21 preuzimanja: 84* citiraj
APA 6th Edition
Janjić, I., Stober, D. i Dolaček-Alduk, Z. (2018). CHANGES IN THE CONSTRUCTION PROCESS AND THE ROLES IN BIM IMPLEMENTATION ON THE EXAMPLE OF A PUBLIC UTILITY BUILDING. e-Zbornik, 8 (15), 11-21. Preuzeto s https://hrcak.srce.hr/203790
MLA 8th Edition
Janjić, Ivan, et al. "CHANGES IN THE CONSTRUCTION PROCESS AND THE ROLES IN BIM IMPLEMENTATION ON THE EXAMPLE OF A PUBLIC UTILITY BUILDING." e-Zbornik, vol. 8, br. 15, 2018, str. 11-21. https://hrcak.srce.hr/203790. Citirano 27.11.2021.
Chicago 17th Edition
Janjić, Ivan, Dina Stober i Zlata Dolaček-Alduk. "CHANGES IN THE CONSTRUCTION PROCESS AND THE ROLES IN BIM IMPLEMENTATION ON THE EXAMPLE OF A PUBLIC UTILITY BUILDING." e-Zbornik 8, br. 15 (2018): 11-21. https://hrcak.srce.hr/203790
Harvard
Janjić, I., Stober, D., i Dolaček-Alduk, Z. (2018). 'CHANGES IN THE CONSTRUCTION PROCESS AND THE ROLES IN BIM IMPLEMENTATION ON THE EXAMPLE OF A PUBLIC UTILITY BUILDING', e-Zbornik, 8(15), str. 11-21. Preuzeto s: https://hrcak.srce.hr/203790 (Datum pristupa: 27.11.2021.)
Vancouver
Janjić I, Stober D, Dolaček-Alduk Z. CHANGES IN THE CONSTRUCTION PROCESS AND THE ROLES IN BIM IMPLEMENTATION ON THE EXAMPLE OF A PUBLIC UTILITY BUILDING. e-Zbornik [Internet]. 2018 [pristupljeno 27.11.2021.];8(15):11-21. Dostupno na: https://hrcak.srce.hr/203790
IEEE
I. Janjić, D. Stober i Z. Dolaček-Alduk, "CHANGES IN THE CONSTRUCTION PROCESS AND THE ROLES IN BIM IMPLEMENTATION ON THE EXAMPLE OF A PUBLIC UTILITY BUILDING", e-Zbornik, vol.8, br. 15, str. 11-21, 2018. [Online]. Dostupno na: https://hrcak.srce.hr/203790. [Citirano: 27.11.2021.]

Sažetak
Zahtjevi za uštedama u projektima koji proizlaze iz globalne potrebe za uštedom resursa potiču inovacije u građevinarstvu, kako u području inovativnih materijala i proizvoda tako i u unaprjeđenju svih procesa gradnje. Promjene u projektu obilježene su rizicima te obično pretpostavljaju potrebu za dodatnim resursima - vremenom i novcem. Upravljanje promjenama razlikuje se za projekt koji se vodi tradicionalno na konsekutivan način od projektiranja do predaje projekta i za projekt koji je izrađen BIM pristupom koji nastoji procese postaviti u većoj mjeri simultano. U radu se donosi pregled literature koja definira razlike ova dva pristupa te se na osnovu teorijske podloge postavlja okvir za istraživanje mogućnosti za unaprjeđenje projekta složene zgrade izrađene i vođene tradicionalnim pristupom.

Ključne riječi
promjene u projektu; BIM pristup; zgrada javne namjene; Građevinski fakultet Osijek

Hrčak ID: 203790

URI
https://hrcak.srce.hr/203790

[engleski]

Posjeta: 475 *