Skoči na glavni sadržaj

Prethodno priopćenje

https://doi.org/10.17794/rgn.2020.4.3

INTELLIGENT NATURAL DUMP FLOODING WELL - CASE STUDY FROM THE AREA OF THE WESTERN PERSIAN/ARABIAN GULF AND POSSIBLE APPLICATION IN THE CROATIAN MATURE OIL FIELD BENIČANCI

Damir Zadravec ; Fika Eco d.o.o., A.G. Matoša 1, 10310 Ivanić Grad, Croatia
Vladislav Brkić ; University of Zagreb, Mining, Geology and Petroleum Engineering Faculty, Pierottijeva 6, 10 000 Zagreb, Croatia, https://orcid.org/0000-0003-2075-1832


Puni tekst: engleski pdf 2.219 Kb

str. 21-31

preuzimanja: 1.521

citiraj


Sažetak

In the process of oil reservoir waterflooding, natural water dump flood technology for reservoir pressure decline prevention is considered as an unconventional but technically less demanding, more economical and safer method in comparison to surface power water injection. With natural dump flood technology, a single well serves as a water producer from a water bearing layer (aquifer) and simultaneously through gravity and the pressure difference between the aquifer and the depleted oil reservoir, it serves as a water injector inside the oil reservoir without expensive and complex injecting water treatment facilities at the surface. With the use of such technology and the running of intelligent well completion, it allows for the permanent monitoring of water production, injection rates and temperature inside the chosen reservoir. In addition, in offshore operations, the use of a subsea wellhead with a mud line suspension system allows for the placing of the injector well at the best predetermined position for water injection in a targeting reservoir and, together with an efficient subsurface acoustic data acquisition system, leads to better reservoir management and well integrity improvement. The overview and critical reflection of the drilling and intelligent completion of a natural dump flooding well for reservoir pressure support in partially depleted oil reservoirs in the Persian/Arabian Gulf has been given, referring to both their preparation and execution phase. The possibility of applying natural water dump flood was also considered in the Croatian onshore Beničanci oil field through a pilot project of water injection into the Be-62 well.

Ključne riječi

natural dump flooding well; intelligent well completion; subsea wellhead; mature oil field; IOR

Hrčak ID:

246071

URI

https://hrcak.srce.hr/246071

Datum izdavanja:

9.11.2020.

Podaci na drugim jezicima: hrvatski

Posjeta: 2.364 *