Conference paper
CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT
Zesong Zhu
Full text: english pdf 158 Kb
page 535-536
downloads: 401
cite
APA 6th Edition
Zhu, Z. (2021). CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT. Psychiatria Danubina, 33 (suppl 8), 535-536. Retrieved from https://hrcak.srce.hr/269052
MLA 8th Edition
Zhu, Zesong. "CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT." Psychiatria Danubina, vol. 33, no. suppl 8, 2021, pp. 535-536. https://hrcak.srce.hr/269052. Accessed 25 Aug. 2026.
Chicago 17th Edition
Zhu, Zesong. "CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT." Psychiatria Danubina 33, no. suppl 8 (2021): 535-536. https://hrcak.srce.hr/269052
Harvard
Zhu, Z. (2021). 'CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT', Psychiatria Danubina, 33(suppl 8), pp. 535-536. Available at: https://hrcak.srce.hr/269052 (Accessed 25 August 2026)
Vancouver
Zhu Z. CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT. Psychiatria Danubina [Internet]. 2021 [cited 2026 August 25];33(suppl 8):535-536. Available from: https://hrcak.srce.hr/269052
IEEE
Z. Zhu, "CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT", Psychiatria Danubina, vol.33, no. suppl 8, pp. 535-536, 2021. [Online]. Available: https://hrcak.srce.hr/269052. [Accessed: 25 August 2026]
Abstract
Keywords
Hrčak ID:
269052
URI
https://hrcak.srce.hr/269052
Publication date:
22.12.2021.
Visits: 814
*