Skoči na glavni sadržaj

Stručni rad

https://doi.org/10.18048/2022.04.10

Implementation of Charging Stations for Hybrid and Electrical Ferries in Croatian Ports

Aleksandar Cuculić ; University of Rijeka, Faculty of Maritime Studies, Studentska 2, Rijeka, Croatia
Ivan Panić ; University of Rijeka, Faculty of Maritime Studies, Studentska 2, Rijeka, Croatia
Jasmin Ćelić orcid id orcid.org/0000-0003-1812-4899 ; University of Rijeka, Faculty of Maritime Studies, Studentska 2, Rijeka, Croatia
Antonio Škrobonja ; University of Rijeka, Faculty of Maritime Studies, Studentska 2, Rijeka, Croatia


Puni tekst: engleski pdf 652 Kb

str. 147-160

preuzimanja: 270

citiraj


Sažetak

An important aspect of introducing hybrid or all-electric ferries on coastlines is to analyze the
supporting land-based energy infrastructure to determine if it is possible to implement charging
systems that such vessels rely on. The battery energy storage systems on such vessels will need to
be rapidly recharged as passengers and vehicles disembark, which means that the flow of electricity
through the distribution grid will be much higher and may lead to power quality issues on the local
grid. Once implemented, shore connection and battery charging systems must be safe for both people
and connected equipment. The issue of implementing shore connections needs to be analyzed from
a technical, economic, and legal perspective. This paper presents the challenges and problems of
implementing charging stations for ferries in Croatian ports as a result of the research conducted within
the project METRO - Maritime Environment-Friendly Transport Systems.

Ključne riječi

Hybrid and electric ferry; battery charging stations; shore connections; battery energy storage; ferry ports

Hrčak ID:

278705

URI

https://hrcak.srce.hr/278705

Datum izdavanja:

24.4.2022.

Posjeta: 531 *