Skoči na glavni sadržaj

Pregledni rad

https://doi.org/10.14256/JCE.4395.2025

Framework for management of risks caused by information asymmetry in construction projects

Ivona Ivić Jazvec
Anita Cerić


Puni tekst: hrvatski pdf 704 Kb

str. 283-296

preuzimanja: 0

citiraj

Puni tekst: engleski pdf 715 Kb

str. 283-296

preuzimanja: 0

citiraj


Sažetak

The occurrence of information asymmetry between clients and contractors is often a source of risk in construction projects. In order to develop a framework for managing these risks, a comprehensive study described in this paper was conducted. The methods employed included content analysis of existing literature and interviews among professionals with significant experience in the execution phase of construction projects. The research identified 20 key risks that arise before and after the signing of a contract between the client and the contractor. It also identified the key consequences of these risks and 15 key strategies for mitigating the risks in question. Based on the obtained results, a framework for managing these risks was developed, linking the identified risks, their consequences, and corresponding mitigation measures. This framework enables a structured approach to risk management across different phases of construction projects.

Ključne riječi

principal-agent theory; information asymmetry; risk identification; risk mitigation measures

Hrčak ID:

349946

URI

https://hrcak.srce.hr/349946

Datum izdavanja:

23.6.2026.

Podaci na drugim jezicima: hrvatski

Posjeta: 5 *