Tehnički vjesnik, Vol. 17 No. 4, 2010.
Izvorni znanstveni članak
Dynamic planning and multicriteria scheduling of turned parts' production
Aleš Slak
; Iskra ISD-Strugarstvo d.o.o., Savska loka 4, SI-4000 Kranj, Slovenia
Jože Tavčar
orcid.org/0000-0001-9046-0913
; Iskra Mehanizmi, Lipnica 8, SI 4245 Kropa, Slovenia
Jože Duhovnik
; University of Ljubljana, Faculty of Mechanical Engineering, Aškerčeva 6, SI-1000 Ljubljana, Slovenia
Sažetak
Technical innovations in the area of manufacturing logistics are being introduced partially and thus not exploiting their full potential. In order to optimise the efficiency of turning manufacturing processes, the process has been analysed and fundamentally re-engineered. All data from production (operations, quantities, date, time duration of operations, etc.) are now located in ERP system. It provided the necessary condition for the establishment of a robust dynamic planning model. An update was required for the whole lifecycle of products and means of work. The paper presents the information support and an algorithm for a dynamic planning model, based on a genetic algorithm. Continuous data capturing and planning in real time are a breakthrough in the management of the process. Presented are a generalised dynamic planning model and a case example from the production of turned parts, which take account of the singularities of a real environment. Production capacities have to be linked up with the supply chain and customers. The presented dynamic planning model can be adapted to various types of production.
Ključne riječi
integrated process planning and scheduling; genetic algorithm; multicriteria scheduling
Hrčak ID:
62920
URI
Datum izdavanja:
31.12.2010.
Posjeta: 2.232 *