Skoči na glavni sadržaj

Izvorni znanstveni članak

https://doi.org/10.14256/JCE.2374.2018

Remediation of traditional stone columns by lead inlays

Josip Atalić
Mario Uroš
Marta Šavor Novak


Puni tekst: hrvatski pdf 1.395 Kb

str. 741-756

preuzimanja: 522

citiraj


Sažetak

Typical cracks often occur on traditional stone columns at the position of joints. In addition, such columns bear witness of various repair methods that have been used over time to stop continuous spreading of cracks. Systematic numerical and laboratory analyses conducted on almost real size samples have revealed that the basic cause of cracking is the concentration of stress at contact surfaces. Some laboratory testing and numerical analysis results, relating to the traditional form of repair with lead inlay placed between column parts, are presented in the paper.

Ključne riječi

stone column; contact stress; uneven surface; stress concentration; lead inlay; laboratory testing; numerical analysis

Hrčak ID:

207197

URI

https://hrcak.srce.hr/207197

Datum izdavanja:

23.10.2018.

Podaci na drugim jezicima: hrvatski

Posjeta: 1.448 *