Stručni rad
https://doi.org/10.21857/yvjrdcl1ey
Delivery and acceptance of a vessel under construction in a foreign port
Amra Pende
Sažetak
This paper outlines a precedent from the Croatian shipbuilding industry, i.e. the delivery and acceptance of two vessels under construction in the port of Turkmenbashi in Turkmenistan, the passage of the vessels through the Volga-Baltic Waterway, the processes of obtaining permission for the passage from the ministries of the Russian Federation, specific legal documentation issued for the vessels under construction for a one-way non-commercial voyage to the port of delivery, delivery and acceptance, and the transfer of ownership and obligations to the shipowner. The paper also considers the amendment to Article 99 of the Maritime Code as a consequence of this marine adventure.
Ključne riječi
shipbuilding contract; vessel under construction; delivery and acceptance outside the shipbuilder’s port; Article 99 of the Croatian Maritime Code
Hrčak ID:
249767
URI
Datum izdavanja:
28.12.2020.
Posjeta: 1.450 *