Skoči na glavni sadržaj

Stručni rad

MULTIPHASE BLASTING OF THE BRIDGE ACROSS THE DRENICA RIVER

Branko Božić


Puni tekst: hrvatski pdf 931 Kb

str. 191-195

preuzimanja: 1.075

citiraj


Sažetak

The construction of new bridges on the sites of the existing ones require demolition of the old bridge. Due to closeness of newly erected bridge elements the fundations of old bridges are demolished by multiphase blasting process. The blasting of the piers and anchorages of the bridge across 'the Drenica river carrying the Balačevac—Goleš industrial railway was done in four phases. The piers and anchorages of a new bridge and its construction elements have been erected before.

Ključne riječi

Bridge; Blasting phases; Protection

Hrčak ID:

24671

URI

https://hrcak.srce.hr/24671

Datum izdavanja:

4.12.1989.

Podaci na drugim jezicima: hrvatski

Posjeta: 2.294 *