Skip to the main content

Original scientific paper

https://doi.org/10.21278/brod69208

RELIABILITY-BASED INSPECTION PLANNING OF THE SHIP STRUCTURE EXPOSED TO FATIGUE DAMAGES

Mohammad Reza Zareei ; Department of Maritime Technology, Amirkabir University of Technology, 424 Hafez Avenue, Tehran 15916-34311, Iran
Mehdi Iranmanesh ; Department of Maritime Technology, Amirkabir University of Technology, 424 Hafez Avenue, Tehran 15916-34311, Iran


Full text: english pdf 1.308 Kb

page 119-134

downloads: 1.790

cite


Abstract

Reliability-based inspection planning is one of the most popular methods in determining the time of inspection and repairs in various structures. In this way, inspection and repair times are determined mainly by putting a lower limit for the reliability index. The detection and measurement of cracks is one of the possible outputs at the time of inspecting fatigue cracking. One way to use this output is to update the parameters of the fatigue reliability equation. In this study, statistical distribution of the parameters of the problem is updated and fatigue reliability is calculated for inspection planning using the Bayesian updating concept through the Markov Chain Monte Carlo (MCMC) method and the Metropolis–Hasting algorithm. The distribution of crack growth equation material parameters and the initial crack length will be updated with this method. The application of the proposed method has been shown in a structural member of a ship.

Keywords

Reliability-based; inspection planning; Fatigue failure; crack growth parameters; Bayesian updating; Markov Chain-Monte Carlo

Hrčak ID:

192666

URI

https://hrcak.srce.hr/192666

Publication date:

30.6.2018.

Visits: 3.005 *