Abstract
A major disturbance that resulted in the tripping of the 400 kV line Tumbri (HR) – Hévíz (H)
and the entire 400 kV node Tumbri in the Croatian system occurred on 27 August 2003 and almost led
to a voltage collapse in that area. The disturbance was initiated by an accidental outage of a generator
at NPP Krško (SLO) due to a human error during regular maintenance work. Its further development
was the consequence of a hidden fault of the numeric protection at the 400 kV switchyard Tumbri. In
the specific system operating conditions (network configuration and generator scheduling) at that
moment, the systems of Slovenia and Austria in the central part of the UCTE system were brought
near voltage collapse. At the same time the operational security level of the power systems of Croatia
and BiH, then at the perimeter of the UCTE system, was also decreased.
The sequence of events is described and discussed in the paper. Recordings of frequency and
active power in representative transmission lines, taken at NDC Zagreb, are also given. A simulation
analysis was performed first for the real disturbance scenario and then for the hypothetical scenario in
which there was no failure of the protection at Tumbri substation and consequently the 400 kV node
Tumbri would have remained in operation. The simulations showed that the loss of a NPP Krško
generator would have only a local impact and would be barely noticeable at the UCTE level had the
400 kV node Tumbri remained in operation. Simulation results are in accordance with information
obtained from the Slovenian power system where severely depressed voltages were recorded,
particularly in the area around NPP Krško. It was also observed that the Slovenian system was acting
as a reactive power sink while active power was flowing in the opposite direction, i.e. towards Croatia.
Assessment of Croatian system security during the disturbance with respect to voltage
stability, frequency and angle stability and congestion criteria was done on the basis of measurements
and simulation results. The conclusion was that Croatian system security with respect to all the above
mentioned criteria was preserved but it must be stressed that the initial system operating conditions
were rather favorable from the stability point of view.