Skip to the main content
  • Publication date: 01.12.2015.
  • Published on HRČAK: 14.12.2015.

Table of contents

Full text

The determination of the market value of works in progress with probability graphs (page 1271-1279)

Istvan Hajnal
Original scientific paper


Fresh Ready-Mixed Concrete Waste in Construction Projects: A Planning Approach (page 1280-1288)

A. Kazaz, Serdar Ulubeyli, Bayram Er, Volkan Arslan, Murat Atici, Ahmet Arslan
Original scientific paper


Impact of Real-time Project Control on Capital Project Cost and Schedule Performance (page 1289-1294)

David Grau, Amin Abbaszadegan
Original scientific paper


Ranking Projects in Multi-Criteria Environment (page 1295-1301)

Zoltan Sebestyen, Tamas Toth
Original scientific paper


History and Some Latest Developments of Precedence Diagramming Method (page 1302-1314)

Miklos Hajdu
Original scientific paper


A Comparative Study of Owner, Contractor, and Consultant Perspective on the Selection Criteria for Subcontractors. (page 1330-1341)

Farnaz Sadeghpour, Shabtal Isaac, Santiago Díez Torrijos, Antonio Ramón Albert, Benjamín Benlloch Miralles, Ricardo Ayala López, José Agustín Lillo Arnalte, Luis Tena Gil
Original scientific paper


Visits: 21.482 *