Skip to the main content

Original scientific paper

https://doi.org/10.17559/TV-20140812000107

Materials supply management in construction projects and satisfaction with the quality of structures

Biljana Blaževska-Stoilkovska orcid id orcid.org/0000-0002-8905-5301 ; Institute of Psychology, Faculty of Philosophy, Ss. Cyril and Methodius University, Blv. Goce Delčev 9A, 1000 Skopje, Republic of Macedonia
Tomáš Hanák orcid id orcid.org/0000-0002-7820-6848 ; Faculty of Civil Engineering, Brno University of Technology, Veveří 95, 602 00 Brno, Czech Republic
Valentina Žileska-Pančovska orcid id orcid.org/0000-0001-7620-4040 ; Faculty of Civil Engineering, Ss. Cyril and Methodius University, Blv. Partizanski odredi 24, 1000 Skopje, Republic of Macedonia


Full text: croatian pdf 370 Kb

page 721-727

downloads: 4.152

cite

Full text: english pdf 370 Kb

page 721-727

downloads: 1.929

cite


Abstract

This paper investigates how construction projects participants’ evaluations of two aspects of material supply management, i.e. communication and coordination among involved parties and materials quality control, are related to satisfaction with the quality of structures. On a sample of 128 respondents in the Republic of Macedonia a questionnaire was administered to assess study variables. It was found that satisfaction with the quality of structures was relatively low. Respondents assessed materials supply management, i.e. coordination and communication among involved parties, and materials quality control as average. Pearson correlation analysis showed that these two variables as aspects of materials supply management were positively related to satisfaction with the structures’ quality. A hierarchical regression analysis revealed that only perceived coordination and communication among involved parties significantly predicted participants’ satisfaction with quality. It was concluded that project participants’ satisfaction with the structures can be increased by paying more attention to materials supply management.

Keywords

construction project participants; materials supply management; satisfaction with quality; structure

Hrčak ID:

139757

URI

https://hrcak.srce.hr/139757

Publication date:

15.6.2015.

Article data in other languages: croatian

Visits: 7.610 *