Skip to the main content

Original scientific paper

https://doi.org/10.17559/TV-20151029124337

Tests of IEEE 1588-based synchronization system in substation

Jungang Li ; Xi’an Jiaotong University, School of Electrical Engineering, 710049, Xi’an, China
Xing Liu ; XJ Electric Corporation Limited, 461000, Xu Chang, China
Hang Zhang ; Xi’an Jiaotong University, School of Electrical Engineering, 710049, Xi’an, China
Aimin Zhang ; Xi’an Jiaotong University, School of Electrical Engineering, 710049, Xi’an, China
Yingsan Geng ; Xi’an Jiaotong University, School of Electrical Engineering, 710049, Xi’an, China


Full text: croatian pdf 1.495 Kb

page 1407-1414

downloads: 1.283

cite

Full text: english pdf 1.495 Kb

page 1407-1414

downloads: 579

cite


Abstract

As a synchronization method, IEEE1588 standard has been applied in substation, it should be tested and verified ensure synchronization accuracy and node interoperability. A comprehensive testing method for the IEEE1588 is proposed in this paper. Furthermore, IEEE1588 clock testing platform is built to support the proposed testing method. Based on the analysis of the clock synchronization error and the performance testing principle method, the accuracy and stability of master clock and slave clock were evaluated. Secondly, the conformance testing to adopt performance response was achieved by designed specific case, based on the above, and then to analyse the conformance implementation details. According to testing requirements, test bed designed. Finally, the experiment based on substation devices was carried out using the IEEE1588 clock testing platform. The feasibility of the proposed methods was further verified with the testing results.

Keywords

conformance testing; device under test (DUT); IEEE 1588; performance testing; precision time synchronization; substation

Hrčak ID:

149368

URI

https://hrcak.srce.hr/149368

Publication date:

14.12.2015.

Article data in other languages: croatian

Visits: 3.137 *