Original scientific paper
System Design for Transitional Aircraft Support
John P. T. Mo
orcid.org/0000-0002-0697-7504
; RMIT University, Australia
Kevin Downey
; BAE Systems, Australia
Abstract
The Australian Defence Force and industry are undergoing significant changes in the way they work together in capability enhancement programs. There are capability gaps in maintaining and supporting current obligations during major asset acquisition, which has migrated into the front line of Royal Air Force Fighter Groups as a new capability. This paper examines a steady state support solution and argues that in order to interchange from one support solution to a new architecture there must be a period for transition, which may need its own interim business model and operational service. A preliminary study of several existing support solutions reveals the generic elements that need to be parameterized and traced through the support system architecture trajectory.
Keywords
Complex Engineering Products; 3PE Model; Product Service System; Services and Logistics Support; Performance Based Contracting
Hrčak ID:
160705
URI
Publication date:
1.1.2014.
Visits: 1.095 *