Skip to the main content

Original scientific paper

Determining cycle time for a multi-product FPR model with rework and an improved delivery policy by alternative approach

Yuan-Shyi Peter Chiu ; Department of Industrial Engineering & Management, Chaoyang University of Technology, Gifong East Road, Wufong, Taichung 413, TAIWAN
Hong-Dar Lin ; Department of Industrial Engineering & Management, Chaoyang University of Technology, Gifong East Road, Wufong, Taichung 413, TAIWAN
Chao-Tang Tseng ; Department of Industrial Engineering & Management, Chaoyang University of Technology, Gifong East Road, Wufong, Taichung 413, TAIWAN
Singa Wang Chiu ; Department of Business Administration, Chaoyang University of Technology, Gifong East Road, Wufong, Taichung 413, TAIWAN


Full text: english pdf 212 Kb

page 27-36

downloads: 194

cite


Abstract

The present study determines the common cycle time for a multi-product finite production rate (FPR) model with rework and an improved delivery policy [1] by an alternative approach. Conventional method to the multi-product FPR problem employs the differential calculus to first prove convexity of the system cost function, then to derive the optimal common production cycle time that minimizes the long-run average system cost per unit time; whereas the proposed approach obtains the optimal cycle time without the need to reference the differential calculus. Such a simplified method may help those practitioners who have insufficient knowledge of calculus to effectively manage the real-life multi-product FPR problem.

Keywords

finite production rate model; algebraic approach; optimization; multi-product system; common production cycle time; rework; improved delivery policy

Hrčak ID:

184897

URI

https://hrcak.srce.hr/184897

Publication date:

22.12.2016.

Visits: 793 *