Skip to the main content

Professional paper

https://doi.org/10.14256/JCE.2604.2019

Project management during construction of the cross-border Svilaj Bridge

Boris Huzjan
Darko Šošić


Full text: croatian pdf 687 Kb

page 781-790

downloads: 556

cite

Full text: english pdf 694 Kb

page 781-790

downloads: 348

cite


Abstract

This paper presents specific project-management features at various stages of the project. The focus is mostly placed on the limitations and differences between regulations and legal frameworks applied in the territories of the Republic of Croatia and Bosnia and Herzegovina. A special emphasis is placed on preconditions to be met for the delivery of building permit and other documents as needed for the start and realisation of works, on the conduct of expert supervision in accordance with technical regulations applied in both countries and the Engineer’s role with regard to realisation of construction contract on behalf of the joint client.

Keywords

Svilaj Bridge; corridor Vc; state-to-state agreement; project management; infrastructure project; EU funds

Hrčak ID:

226745

URI

https://hrcak.srce.hr/226745

Publication date:

16.9.2019.

Article data in other languages: croatian

Visits: 1.520 *