Skip to the main content

Original scientific paper

https://doi.org/10.17794/rgn.2022.5.9

DETERMINING A RESILIENT STOPE BOUNDARY FOR UNDERGROUND MASS MINING PROJECTS

Mohammad Shami-Qalandari ; School of Mining, College of Engineering University of Tehran, Tehran, Iran
Mehdi Rahmanpour ; School of Mining, College of Engineering University of Tehran, Tehran, Iran
S. M. Mahdi Mirabedi ; School of Mining, College of Engineering University of Tehran, Tehran, Iran


Full text: english pdf 3.825 Kb

page 103-116

downloads: 253

cite


Abstract

Uncertainty-based stope boundary optimization is a complex part of underground mine planning, especially in mass mining projects and notably block caving. Besides, grade variation and grade uncertainty are significant sources of error in mining projects. This paper presents a procedure to determine a resilient block-cave stope boundary considering the ore grade uncertainties. The procedure applies the floating stope algorithm, the maximum upside/minimum downside, and the value at risk for design evaluation. The floating stope algorithm is customized for block caving and is used to determine the stope boundary over some simulated grade models. The idea fits into a multi-criteria decision-making problem. Finally, the most resilient stope boundary is selected by considering several criteria and the TOPSIS method. According to the results, the resilient stope boundary covers an area where the mineable reserve is 977 Mt with an average copper grade of 0.51%.

Keywords

block caving; resilient stope boundary; grade uncertainty

Hrčak ID:

286717

URI

https://hrcak.srce.hr/286717

Publication date:

7.12.2022.

Article data in other languages: croatian

Visits: 968 *