Determination of Time and Cost Deviations on the Example of the Residential Construction Project in Štinjan

Žan Mandić ; University of Rijeka, Faculty of Civil Engineering
Diana Car-Pušić ; University of Rijeka, Faculty of Civil Engineering
Ivan Marović orcid id orcid.org/0000-0003-1524-0333 ; University of Rijeka, Faculty of Civil Engineering


Full text: croatian PDF 1.292 Kb

page 155-170

downloads: 572

cite


Abstract

The aim of work is to present a model for monitoring the construction time and cost aspects of terraced houses in Štinjan. The model will include the development of a structural breakdown of the project, planned cost curve and time plan of works using the method of past activities. In addition to the curve of planned values, the curve of realized values will also be created. The identified deviations will be analyzed, the risks that caused them will be identified, and appropriate measures, to reduce or eliminate the deviations, shall be proposed.

Keywords

construction project; risks; overrun; cost curve; time plan