Skoči na glavni sadržaj

Stručni rad

https://doi.org/10.32762/zr.25.1.10

Determination of Time and Cost Deviations on the Example of the Residential Construction Project in Štinjan

Žan Mandić ; Sveučilište u Rijeci, Građevinski fakultet
Diana Car-Pušić ; Sveučilište u Rijeci, Građevinski fakultet
Ivan Marović orcid id orcid.org/0000-0003-1524-0333 ; Sveučilište u Rijeci, Građevinski fakultet


Puni tekst: hrvatski PDF 1.292 Kb

str. 155-170

preuzimanja: 338

citiraj


Sažetak

The aim of work is to present a model for monitoring the construction time and cost aspects of terraced houses in Štinjan. The model will include the development of a structural breakdown of the project, planned cost curve and time plan of works using the method of past activities. In addition to the curve of planned values, the curve of realized values will also be created. The identified deviations will be analyzed, the risks that caused them will be identified, and appropriate measures, to reduce or eliminate the deviations, shall be proposed.

Ključne riječi

construction project; risks; overrun; cost curve; time plan

Hrčak ID:

288291

URI

https://hrcak.srce.hr/288291

Datum izdavanja:

22.12.2022.

Podaci na drugim jezicima: hrvatski

Posjeta: 601 *