IMPLEMENTATION OF AUTOMATED PROCESS MEASUREMENTS OF BUOYANCY PRESSURES AND TEMPERATURES IN THE CONCRETE DAM OF A HYDROPOWER PLANT

Krešimir Osman orcid id orcid.org/0000-0002-7385-2656 ; University of Applied Sciences – Department of Electrical Engineering, Zagreb, Croatia
Josip Husnik ; Markoja d.o.o. Network Infrastructure and Measurement Equipment, Zagreb, Croatia


Full text: english pdf 1.192 Kb

page 251-259

downloads: 147

cite


Abstract

The paper presents the implementation of the automation of existing measuring points by installing vibrating wire piezometers in the inlet and outlet tunnels of the hydropower plant. This achieved automatic recording and display of the data on the monitoring system so that the measuring points no longer have to be visited to read the measured values manually. The process measurements of the uplift pressures at the base of the dam allow the condition of the injection curtain to be monitored and the permeability of the dam to be checked in real-time, which is extremely important for the stability of the structure. This paper describes the functionalities and installation of all components of the measurement system. It also analyses the measurement data with a graphical representation of the measurement data to achieve optimal system operation.

Keywords

dam; buoyancy; temperature; measurement system; vibrating wire piezometer; data logger