Professional paper
https://doi.org/10.47960/2232-9080.2023.26.13.9
EXCAVATION OF THE FOUNDATION OF PIERS S1L AND S1R OF THE VRANDUK I BRIDGE BY CONTROLLED BLASTING ON THE MOTORWAY ROUTE: ZENICA MUNICIPALITY NORTHERN ADMINISTRATIVE BOUNDARY - ZENICA NORTH
Ekrem Bektašević
orcid.org/0000-0001-6742-966X
; PPG d.o.o. Sarajevo
*
Reuf Kadrić
; JP Autoceste FBiH Mostar
*
Marin Nikolić
; Trasa d.o.o. Sarajevo
*
Kemal Gutić
; University of Tuzla, Faculty of Mining, Geology and Civil Engineering
*
Sead Kadrić
orcid.org/0000-0002-0295-9413
; FM INŽENJERING d.o.o. Sarajevo
*
* Corresponding author.
Abstract
The Vranduk I bridge is located on the motorway route, on the part of the subsection: Zenica Municipality Northern Administrative Boundary - Zenica North. The bridge consists of two parallel structures, one for the left side, and the other for the right side of the motorway. The Vranduk I bridge rests on three piers. The paper deals with the excavation of the pier site S1R and S1L by controlled blasting. By correctly choosing the equipment for drilling blast holes, defining the drilling and blasting parameters and excavation steps, a minimal zone of damage to the surrounding rock outside the line of excavation of pier sites S1R and S1L, which is inevitable during blasting excavation, has been achieved, which has the effect of preserving the bearing capacity of the rock mass as the most important supporting element.
Keywords
excavation; piers; drilling pattern; blasting; explosives
Hrčak ID:
312224
URI
Publication date:
21.12.2023.
Visits: 630 *