Security of Operation and Identification of Possible Bottlenecks in Southeast Europe Transmission Network Under Market Conditions

D. Bajs
N. Dizdarević
G. Majstrović


Full text: croatian pdf 448 Kb

page 96-119

downloads: 503

cite

Full text: english pdf 448 Kb

page 96-119

downloads: 391

cite


Abstract

Based on the results of calculations of power flows and on the analysis of the operation of the HV transmission network in Southeast Europe, with the market focus on generation facilities, the basic characteristics of the network are described and possible bottlenecks identified. The calculations were done within the EC-funded REBIS project (Regional Balkans Infrastructure Study) and the Generation Investment Study (GIS) of new power generation capacities in the region. The market offering of generation facilities in Southeast Europe at forecast system peak loads in 2010 and 2015, for different hydrological conditions, was determined by the WASP (IAEA) and GTMax (Argonne NL) software. Calculations of power flows were carried out by using the PSS/E software (Siemens PTI). The article particularly discuses simulated power plant output and the operation of the transmission network in the Republic of Croatia.

Keywords

market offering of power plants; power flows; security analyses; Southeast Europe