Stručni rad
EXPLORATION WELL TEST CASE HISTORY CONFIRMS IMPORTANCE OF DST
Dario Damjanić
Sažetak
Drill stem testing of the exploration well consisted of two flow and two pressure build-up periods. Gas was obtained. Modified isochronal test was used during testing the well after completion. Except gas, small quantity of condensate and traces of oil and water were obtained. Both pressure build-up analyses showed that formation permeability is low. DST pressure build-up analysis showed that wellbore damage is present. This was proved later, when acid treatment was performed, by which skin was removed and production increased significantly. Data obtained by well testing are very important for future productivity prediction and determination of optimal well completion and surface facility construction.
Ključne riječi
drill stem testing (DST); well testing; pressure build-up; reservoir properties; fluid content
Hrčak ID:
47250
URI
Datum izdavanja:
4.12.2009.
Posjeta: 2.872 *