hrcak mascot   Srce   HID

Izvorni znanstveni članak

Transport, installation and commissioning of power transformers

Kenneth Budin ; Wilson Transformer

Puni tekst: engleski, pdf (481 KB) str. 22-29 preuzimanja: 7.363* citiraj
APA 6th Edition
Budin, K. (2015). Transport, installation and commissioning of power transformers. Transformers Magazine, 2 (1), 22-29. Preuzeto s https://hrcak.srce.hr/182919
MLA 8th Edition
Budin, Kenneth. "Transport, installation and commissioning of power transformers." Transformers Magazine, vol. 2, br. 1, 2015, str. 22-29. https://hrcak.srce.hr/182919. Citirano 29.11.2020.
Chicago 17th Edition
Budin, Kenneth. "Transport, installation and commissioning of power transformers." Transformers Magazine 2, br. 1 (2015): 22-29. https://hrcak.srce.hr/182919
Harvard
Budin, K. (2015). 'Transport, installation and commissioning of power transformers', Transformers Magazine, 2(1), str. 22-29. Preuzeto s: https://hrcak.srce.hr/182919 (Datum pristupa: 29.11.2020.)
Vancouver
Budin K. Transport, installation and commissioning of power transformers. Transformers Magazine [Internet]. 2015 [pristupljeno 29.11.2020.];2(1):22-29. Dostupno na: https://hrcak.srce.hr/182919
IEEE
K. Budin, "Transport, installation and commissioning of power transformers", Transformers Magazine, vol.2, br. 1, str. 22-29, 2015. [Online]. Dostupno na: https://hrcak.srce.hr/182919. [Citirano: 29.11.2020.]

Sažetak
Whilst much attention is quite rightly given to power transformer design, manufacturing and factory acceptance testing, the final stages of the supply chain are equally important, namely transport, installation and commissioning. The health of the transformer is critically dependent on safe and careful handling during transport and unloading where sudden impacts or shocks can lead to damage of critical components. Of equal importance are the processes and practices used at site during assembly, vacuum processing and addition of the insulating fluid. Commissioning tests ensure that the transformer has not been damaged during handling, that active component connections are correct and that the transformer protection and monitoring systems are operational. This paper will address these issues and provide guidance on world’s best practices to ensure a positive outcome for the supplier and the end customer.

Ključne riječi
power transformers; transport; installation; commissioning