hrcak mascot   Srce   HID

Preliminary communication
https://doi.org/10.17559/TV-20170225144013

Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan

Adil Kadyrov ; Karaganda State Technical University, Department of Transport Technics and Logistics Systems, Krivoguz street, 86, 100000, Karaganda, Kazakhstan
Vyacheslav Kunaev   ORCID icon orcid.org/0000-0001-8283-7186 ; Karaganda State Industrial University, Department of Technological Machines and Transport, Shkolnaya street, 7-15, 101402, Temirtau, Kazakhstan
Ivan Georgiadi ; Karaganda State Technical University, Department of Transport Technics and Logistics Systems, Zelenaya street, 24, 101400, Temirtau, Kazakhstan
Rashid Khaibullin ; Karaganda State Technical University, Department of Industrial Transport named prof. A.N. Daniyarov, Lenin street, 61/2-19, 100017 Karaganda, Kazakhstan

Fulltext: english, pdf (1 MB) pages 1159-1163 downloads: 340* cite
APA 6th Edition
Kadyrov, A., Kunaev, V., Georgiadi, I. & Khaibullin, R. (2019). Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan. Tehnički vjesnik, 26 (4), 1159-1163. https://doi.org/10.17559/TV-20170225144013
MLA 8th Edition
Kadyrov, Adil, et al. "Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan." Tehnički vjesnik, vol. 26, no. 4, 2019, pp. 1159-1163. https://doi.org/10.17559/TV-20170225144013. Accessed 17 Jun. 2021.
Chicago 17th Edition
Kadyrov, Adil, Vyacheslav Kunaev, Ivan Georgiadi and Rashid Khaibullin. "Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan." Tehnički vjesnik 26, no. 4 (2019): 1159-1163. https://doi.org/10.17559/TV-20170225144013
Harvard
Kadyrov, A., et al. (2019). 'Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan', Tehnički vjesnik, 26(4), pp. 1159-1163. https://doi.org/10.17559/TV-20170225144013
Vancouver
Kadyrov A, Kunaev V, Georgiadi I, Khaibullin R. Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan. Tehnički vjesnik [Internet]. 2019 [cited 2021 June 17];26(4):1159-1163. https://doi.org/10.17559/TV-20170225144013
IEEE
A. Kadyrov, V. Kunaev, I. Georgiadi and R. Khaibullin, "Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan", Tehnički vjesnik, vol.26, no. 4, pp. 1159-1163, 2019. [Online]. https://doi.org/10.17559/TV-20170225144013

Abstracts
Due to the poorly developed road network in Kazakhstan and the poor condition of the existing road communications, the issue of construction of new and reconstruction of existing roads is really crucial for the country. The article examines the problems of road construction in Central Kazakhstan, and proposes specific solutions to some of them. To reduce the construction cost of the subbase, the article suggests using a new building material instead of natural stone rubble. It is made of waste and by-products of manufacturing available in the region (blast-furnace slag and microsilica) hydrophobizated by used engine oil. Photos of the laboratory samples and the results of the experimental researches of this road-building material are attached to the article. To reduce the labour intensity of stiff and frozen soil excavation during the preparation of the subgrade, the article provides the use of a new working part of excavation machine. This working component is a cutterhead developed at the premises of The Karaganda State Technical University. The article deals with construction of this machine and principle of its operation.

Keywords
Central Kazakhstan; construction; cutterhead; excavation of stiff and frozen soils; road-building materials; slag-crushed stone