hrcak mascot   Srce   HID

Original scientific paper

IPR CURVE CALCULATING FOR A WELL PRODUCING BY INTERMITTENT GAS-LIFT METHOD

Zoran Mršić
Marin Čikeš

Fulltext: croatian, pdf (638 KB) pages 83-92 downloads: 684* cite
APA 6th Edition
Mršić, Z. & Čikeš, M. (2009). IZRAČUNAVANJE INDIKATORSKE KRIVULJE PRI PROIZVODNJI POVREMENIM PLINSKIM LIFTOM. Rudarsko-geološko-naftni zbornik, 21 (1), 83-92. Retrieved from https://hrcak.srce.hr/47253
MLA 8th Edition
Mršić, Zoran and Marin Čikeš. "IZRAČUNAVANJE INDIKATORSKE KRIVULJE PRI PROIZVODNJI POVREMENIM PLINSKIM LIFTOM." Rudarsko-geološko-naftni zbornik, vol. 21, no. 1, 2009, pp. 83-92. https://hrcak.srce.hr/47253. Accessed 8 Aug. 2020.
Chicago 17th Edition
Mršić, Zoran and Marin Čikeš. "IZRAČUNAVANJE INDIKATORSKE KRIVULJE PRI PROIZVODNJI POVREMENIM PLINSKIM LIFTOM." Rudarsko-geološko-naftni zbornik 21, no. 1 (2009): 83-92. https://hrcak.srce.hr/47253
Harvard
Mršić, Z., and Čikeš, M. (2009). 'IZRAČUNAVANJE INDIKATORSKE KRIVULJE PRI PROIZVODNJI POVREMENIM PLINSKIM LIFTOM', Rudarsko-geološko-naftni zbornik, 21(1), pp. 83-92. Available at: https://hrcak.srce.hr/47253 (Accessed 08 August 2020)
Vancouver
Mršić Z, Čikeš M. IZRAČUNAVANJE INDIKATORSKE KRIVULJE PRI PROIZVODNJI POVREMENIM PLINSKIM LIFTOM. Rudarsko-geološko-naftni zbornik [Internet]. 2009 [cited 2020 August 08];21(1):83-92. Available from: https://hrcak.srce.hr/47253
IEEE
Z. Mršić and M. Čikeš, "IZRAČUNAVANJE INDIKATORSKE KRIVULJE PRI PROIZVODNJI POVREMENIM PLINSKIM LIFTOM", Rudarsko-geološko-naftni zbornik, vol.21, no. 1, pp. 83-92, 2009. [Online]. Available: https://hrcak.srce.hr/47253. [Accessed: 08 August 2020]

Abstracts
Master degree thesis (Mršić Z., 2009) shows the detailed procedure of calculating inflow performance curve for intermittent gas lift, based entirely on the data measured at surface. This article explains the detailed approach of the mentioned research and the essence of the results and observations acquired during the study.
To evaluate the proposed method of calculating the average bottom hole flowing pressure (BHFP) as the key parameter of inflow performance calculation, downhole pressure surveys have been conducted in three producing wells at Šandrovac and Bilogora oil fields: Šandrovac-75α, Bilogora-52 and Šandrovac-34. Absolute difference between measured and calculated values of average BHFP for first two wells was Δp=0,64 bar and Δp=0,06 bar while calculated relative error was εr=0,072 and εr=0,0038 respectively.
Due to gas-lift valve malfunction in well Šandrovac-34, noticed during downhole pressure survey, value of calculated BHFP cannot be considered correct to compare with measured value.
Based on the measured data the information have been revealed about actual values of a certain intermittent gas lift parameters that are usually assumed based on experience gained values or are calculated using empirical equations given in literature.
The significant difference has been noticed for a parameter t2. The length of a minimum pressure period for which the measured values were in range of 10,74 min up to 16 min, while empirical equation gives values in the range of 1,23 min up to 1,75 min. Based on measured values of above mentioned parameter a new empirical equation has been established.

Keywords
inflow performance curve; system analysis; artificial lift; intermittent gas lift; flowing bottomhole pressure; gas-lift valve mechanics