Skoči na glavni sadržaj

Izvorni znanstveni članak

An EPQ model with a random breakdown, rework, and a discontinuous issuing policy

Singa Wang Chiu ; Department of Business Administration, Chaoyang University of Technology, Gifong East Road, Wufong, Taichung 413, TAIWAN
Chih-Kai Chang ; Department of Industrial Engineering & Management, Chaoyang University of Technology, Gifong East Road, Wufong, Taichung 413, TAIWAN
Ming-Syuan Song ; Department of Industrial Engineering & Management, Chaoyang University of Technology, Gifong East Road, Wufong, Taichung 413, TAIWAN
Yuan-Shyi Peter Chiu ; Department of Industrial Engineering & Management, Chaoyang University of Technology, Gifong East Road, Wufong, Taichung 413, TAIWAN


Puni tekst: engleski pdf 336 Kb

str. 1-15

preuzimanja: 343

citiraj


Sažetak

This study attempts to determine the optimal production run time for an economic production quantity (EPQ) model with a Poisson breakdown rate, the rework of nonconforming items, and multi-delivery of finished products. It is assumed that nonconforming items can be randomly produced and repaired through a rework process added at the end of the production process. Production equipment is subject to a random breakdown, which follows a Poisson distribution. When a breakdown occurs, the machine immediately goes under repair and adopts an abort/resume inventory control policy. Under this policy, the production of the interrupted lot instantaneously resumes when the machine is repaired and restored. Upon completion of the rework process, n fixed quantity installments of the finished batch are delivered to the customer at a fixed interval of time. Mathematical modelling together with a numerical analysis is used in this study. Theorems on the convexity of the expected system cost function and bounds of production uptime are proposed and proved. A recursive searching algorithm is developed to find the optimal replenishment uptime within the bounds. Finally, a numerical example is provided to demonstrate the practical usage of the study results.

Ključne riječi

economic production quantity; breakdown; multi-delivery; rework; abort-resume; policy; optimization

Hrčak ID:

169837

URI

https://hrcak.srce.hr/169837

Datum izdavanja:

21.7.2016.

Posjeta: 1.062 *