Izvorni znanstveni članak
Construction time-cost model in Croatia
Diana Car-Pušić
; Faculty of Civil Engineering, University of Rijeka, Viktora Cara Emina 5, HR-51000 Rijeka, CROATIA
Mladen Radujković
; Faculty of Civil Engineering, University of Zagreb, Kačićeva 26, HR-10000 Zagreb, CROATIA
Sažetak
The paper deals with the applicability of the time-cost model for calculating the sustainable construction time for building projects in Croatia. In this model the time is expressed as a function of money in the project, while the specific constants K and B need to be determined. These constants depend on economic characteristics of the country or a larger area, therefore had to be separately calculated for a region with similar economic characteristics. The modelling of the constants was performed for two groups of building projects - the roads and residential and office multi-storey buildings. The obtained results have been analyzed and compared to the corresponding results from abroad.
Ključne riječi
construction time; time-cost model; constants K and B; linear regression analysis; building projects
Hrčak ID:
185916
URI
Datum izdavanja:
4.5.2011.
Posjeta: 735 *