Skoči na glavni sadržaj
  • Datum izdavanja: 04.05.2011.
  • Objavljen na Hrčku: 20.07.2020.

Sadržaj

Puni tekst

Incorporating machine reliability issue and backlogging into the EMQ model - Part I: Random breakdown occurring in backorder filling time (str. 1-13)

Yuan-Shyi Peter Chiu, Yu-Lung Lien, Chih-An Katherine Lin
Izvorni znanstveni članak


Incorporating machine reliability issue and backlogging into the EMQ model - Part II: Random breakdown occurring in inventory piling time (str. 15-24)

Singa Wang Chiu, Yuan-Shyi Peter Chiu, Hsien-Ju Chuang, Chien-Hua Lee
Izvorni znanstveni članak


Optimal production-shipment decisions for the finite production rate model with scrap (str. 25-34)

Singa Wang Chiu, Hong-Dar Lin, Chi-Bin Cheng, Chia-Ling Chung
Izvorni znanstveni članak


A critical evaluation and comparison of four manufacturing simulators using analytic hierarchy process (str. 35-51)

Ashu Gupta, Rajesh Verma, Kawaljeet Singh
Izvorni znanstveni članak


Construction time-cost model in Croatia (str. 63-70)

Diana Car-Pušić, Mladen Radujković
Izvorni znanstveni članak


Dynamics simulation research on load vehicle of deep submergence rescue vehicle (LV-DSRV) (str. 71-79)

Yao Hai, Bao Jinsong, Hu Xiaofeng, Jin Ye
Prethodno priopćenje


Finite element analysis of open die extrusion of Al-5Zn-1Mg alloy (str. 81-88)

K. Geethalakshmi, K. Srinivasan
Prethodno priopćenje


Smart and micro grid model for renewable energy based power system (str. 89-94)

Don Jacob, Kannan Nithiyananthan
Stručni rad


Posjeta: 7.356 *