hrcak mascot   Srce   HID

Izvorni znanstveni članak
https://doi.org/10.2478/otmcj-2018-0026

Method for Base Estimation of Construction Time for Linear Projects in Front-end Project Phases

Ivana Burcar Dunovic ; Faculty of Civil Engineering, University of Zagreb, Zagreb, Croatia.
Kristijan Robert Prebanić ; Faculty of Civil Engineering, University of Zagreb, Zagreb, Croatia.
Pavao Durrigl ; Strabag d.o.o.

Puni tekst: engleski, pdf (933 KB) str. 2312-2326 preuzimanja: 40* citiraj
APA 6th Edition
Burcar Dunovic, I., Prebanić, K.R. i Durrigl, P. (2021). Method for Base Estimation of Construction Time for Linear Projects in Front-end Project Phases. Organization, technology & management in construction, 13 (1), 2312-2326. https://doi.org/10.2478/otmcj-2018-0026
MLA 8th Edition
Burcar Dunovic, Ivana, et al. "Method for Base Estimation of Construction Time for Linear Projects in Front-end Project Phases." Organization, technology & management in construction, vol. 13, br. 1, 2021, str. 2312-2326. https://doi.org/10.2478/otmcj-2018-0026. Citirano 18.09.2021.
Chicago 17th Edition
Burcar Dunovic, Ivana, Kristijan Robert Prebanić i Pavao Durrigl. "Method for Base Estimation of Construction Time for Linear Projects in Front-end Project Phases." Organization, technology & management in construction 13, br. 1 (2021): 2312-2326. https://doi.org/10.2478/otmcj-2018-0026
Harvard
Burcar Dunovic, I., Prebanić, K.R., i Durrigl, P. (2021). 'Method for Base Estimation of Construction Time for Linear Projects in Front-end Project Phases', Organization, technology & management in construction, 13(1), str. 2312-2326. https://doi.org/10.2478/otmcj-2018-0026
Vancouver
Burcar Dunovic I, Prebanić KR, Durrigl P. Method for Base Estimation of Construction Time for Linear Projects in Front-end Project Phases. Organization, technology & management in construction [Internet]. 2021 [pristupljeno 18.09.2021.];13(1):2312-2326. https://doi.org/10.2478/otmcj-2018-0026
IEEE
I. Burcar Dunovic, K.R. Prebanić i P. Durrigl, "Method for Base Estimation of Construction Time for Linear Projects in Front-end Project Phases", Organization, technology & management in construction, vol.13, br. 1, str. 2312-2326, 2021. [Online]. https://doi.org/10.2478/otmcj-2018-0026

Sažetak
Even though horizontally linear projects have
low complexity schedules, they are still not successful in
meeting planned time. The deadlines are mostly based
on estimations done in front-end project development when
limited data are available. Early time estimation models
in literature rely on few variables and, almost in all cases,
one of them is the estimated cost. Early cost estimations
can significantly deviate from actual costs and thus lead to
unreliable time estimation. Time estimation models based
on neural network and other alternative methods require
databases and software, which complicates the process of
time estimation. The purpose of this paper is to bridge the
gap of scarce time estimation models and unreliable time
estimates by developing a new method for time estimation.
This research has been done on one large sewer system
project. The case study shows how to extract several continuous
activities for a pipeline project chosen from a sewer
system. Moreover, a new algorithm for the calculation of
project duration is devised based on the existing equation
related to the linear scheduling method, and this algorithm
works with continuous activities. The new method for construction
time estimation is based on the extraction of linear
continuous activities, usage of the algorithm for identification
of minimal buffer between activities, and calculation of
the project duration. To verify the algorithm, this method is
used on another pipeline project from a sewer system. The
limitation is that this method can be used only for base estimation.
Further research needs to be done to include uncertainties
and risks in the method.

Ključne riječi
construction time estimation; linear projects; method; algorithm

Hrčak ID: 255125

URI
https://hrcak.srce.hr/255125

Posjeta: 81 *