Preliminary communication
INTERACTIVE SCHEDULING SYSTEM
Peter Bubeník
Dariusz Plinta
Abstract
This paper deals with the discussion on the use of simulation techniques for work order scheduling on the factory floor level of production and contains a description of the program electronic planning board with simulation elements for Finite Capacity Scheduling. The ability to implement simulation effectively for factory scheduling is dependent upon the availability of shop floor data and the response time for the evaluation process.
Keywords
Hrčak ID:
19134
URI
Publication date:
20.12.2005.
Visits: 3.484 *