Izlaganje sa skupa
CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT
Zesong Zhu
Puni tekst: engleski pdf 158 Kb
str. 535-536
preuzimanja: 218
citiraj
APA 6th Edition
Zhu, Z. (2021). CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT. Psychiatria Danubina, 33 (suppl 8), 535-536. Preuzeto s https://hrcak.srce.hr/269052
MLA 8th Edition
Zhu, Zesong. "CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT." Psychiatria Danubina, vol. 33, br. suppl 8, 2021, str. 535-536. https://hrcak.srce.hr/269052. Citirano 23.12.2024.
Chicago 17th Edition
Zhu, Zesong. "CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT." Psychiatria Danubina 33, br. suppl 8 (2021): 535-536. https://hrcak.srce.hr/269052
Harvard
Zhu, Z. (2021). 'CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT', Psychiatria Danubina, 33(suppl 8), str. 535-536. Preuzeto s: https://hrcak.srce.hr/269052 (Datum pristupa: 23.12.2024.)
Vancouver
Zhu Z. CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT. Psychiatria Danubina [Internet]. 2021 [pristupljeno 23.12.2024.];33(suppl 8):535-536. Dostupno na: https://hrcak.srce.hr/269052
IEEE
Z. Zhu, "CURRENT SITUATION ANALYSIS AND CONTROL MEASURES OF CONSTRUCTION ENGINEERING MANAGEMENT UNDER THE BACKGROUND OF COGNITIVE IMPAIRMENT", Psychiatria Danubina, vol.33, br. suppl 8, str. 535-536, 2021. [Online]. Dostupno na: https://hrcak.srce.hr/269052. [Citirano: 23.12.2024.]
Sažetak
Ključne riječi
Hrčak ID:
269052
URI
https://hrcak.srce.hr/269052
Datum izdavanja:
22.12.2021.
Posjeta: 416
*