Skip to the main content

Professional paper

https://doi.org/10.14256/JCE.1430.2015

Repair of Krk Bridge

Boris Huzjan
Nina Ostojić


Full text: croatian pdf 713 Kb

page 735-743

downloads: 867

cite

Full text: english pdf 2.377 Kb

page 735-743

downloads: 578

cite


Abstract

The construction chronology of both arches of the Krk Bridge is described, and specific features of the site on which the bridge was built are given. The influence of the arches on the reinforced concrete structure of the bridge is explained. A general overview of analyses conducted on the small and large arches of the bridge is given, and the proposed repair and protection solutions are presented. The results of the last chloride penetration analysis, and the report submitted after final repair, are described in great detail.

Keywords

Krk Bridge; chloride penetration; analyses; repairs; protection

Hrčak ID:

168018

URI

https://hrcak.srce.hr/168018

Publication date:

26.10.2016.

Article data in other languages: croatian

Visits: 2.449 *