Skoči na glavni sadržaj

Stručni rad

https://doi.org/10.14256/JCE.1430.2015

Repair of Krk Bridge

Boris Huzjan
Nina Ostojić


Puni tekst: hrvatski pdf 713 Kb

str. 735-743

preuzimanja: 867

citiraj

Puni tekst: engleski pdf 2.377 Kb

str. 735-743

preuzimanja: 578

citiraj


Sažetak

The construction chronology of both arches of the Krk Bridge is described, and specific features of the site on which the bridge was built are given. The influence of the arches on the reinforced concrete structure of the bridge is explained. A general overview of analyses conducted on the small and large arches of the bridge is given, and the proposed repair and protection solutions are presented. The results of the last chloride penetration analysis, and the report submitted after final repair, are described in great detail.

Ključne riječi

Krk Bridge; chloride penetration; analyses; repairs; protection

Hrčak ID:

168018

URI

https://hrcak.srce.hr/168018

Datum izdavanja:

26.10.2016.

Podaci na drugim jezicima: hrvatski

Posjeta: 2.449 *