Skip to the main content
  • Publication date: 04.05.2011.
  • Published on HRČAK: 20.07.2020.

Table of contents

Full text

Incorporating machine reliability issue and backlogging into the EMQ model - Part I: Random breakdown occurring in backorder filling time (page 1-13)

Yuan-Shyi Peter Chiu, Yu-Lung Lien, Chih-An Katherine Lin
Original scientific paper


Incorporating machine reliability issue and backlogging into the EMQ model - Part II: Random breakdown occurring in inventory piling time (page 15-24)

Singa Wang Chiu, Yuan-Shyi Peter Chiu, Hsien-Ju Chuang, Chien-Hua Lee
Original scientific paper


Optimal production-shipment decisions for the finite production rate model with scrap (page 25-34)

Singa Wang Chiu, Hong-Dar Lin, Chi-Bin Cheng, Chia-Ling Chung
Original scientific paper


A critical evaluation and comparison of four manufacturing simulators using analytic hierarchy process (page 35-51)

Ashu Gupta, Rajesh Verma, Kawaljeet Singh
Original scientific paper


Construction time-cost model in Croatia (page 63-70)

Diana Car-Pušić, Mladen Radujković
Original scientific paper


Dynamics simulation research on load vehicle of deep submergence rescue vehicle (LV-DSRV) (page 71-79)

Yao Hai, Bao Jinsong, Hu Xiaofeng, Jin Ye
Preliminary communication


Finite element analysis of open die extrusion of Al-5Zn-1Mg alloy (page 81-88)

K. Geethalakshmi, K. Srinivasan
Preliminary communication


Smart and micro grid model for renewable energy based power system (page 89-94)

Don Jacob, Kannan Nithiyananthan
Professional paper


Visits: 7.356 *